Do you want Empower Tips sent to your inbox each week?
  • Support Articles

Empower Tip: Empower CDS User Question

Empower Tip: Empower CDS User Question

Tip #247: Calculating Peak Fronting

Tip #247: Calculating Peak Fronting

In this tip, we will answer an Empower CDS user question.

Q: Empower calculates peak tailing, however, how can I calculate peak fronting?

Great question. This can be done with a couple of simple Custom Fields.

STEP 1

STEP 1

The definition of USP Tailing is width @5% of peak height/(2 x front half of the peak). The front half of the peak is the time from width start point at 5% of peak height to retention time and reported as f@5%.

STEP 2:

We can calculate the back half of the peak by subtracting the front half of the peak from the width@5%.

STEP 3

STEP 3

Using the USP Tailing formula, we could calculate fronting by the following: width @5% of peak height/(2 x back half of the peak).

STEP 4

STEP 4

Alternatively, we could use the symmetry calculation which is back half/front half and flip that around to be front half/back half.

STEP 5

STEP 5

If the value is greater than 1, the peak is fronted. Here is an example chromatogram with all the fields.

It's that easy!

Final Notes

This can be done with either the Pro or QuickStart interface.



About the Author

About the Author

Neil Lander

Neil provides internal support for Empower CDS software and is focused on developing laboratory software solutions that help organizations achieve their scientific and operational objectives.



Need Help? Connect with a Waters expert. 

Back To Top Back To Top