Site preparation checklist

Site preparation checklist
Topic LCI-SPG-0038, 最近更新 06/23/2023

You must complete this checklist and return it to your Waters representative when all site preparation requirements are met.

Table 1. Customer confirmation
  • I confirm that all required supplies are available.
  • I confirm that all site preparation requirements were met and the requirement check boxes were completed for all of the following: {checklist_items}
  • I confirm that an operator is available for demonstration and training by a Waters engineer during the installation.

    Indicate availability:

    • During the entire installation
    • During part of the installation: approximately ______% of the time
    Important: If the designated person cannot be present at the installation, notify your Waters representative so that we can reschedule the installation for a more convenient time.

Customer signature:

Date: